Planning your stage inspections on an Atherstone build
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.
We inspect the wet area membranes after they have cured and before the tiler starts, because a fault in a membrane is invisible and permanent once tiles are bedded over it.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
The membrane details we see fail most often are small: a bath junction lapped 20mm instead of 40mm, a bond breaker too thin at a hob, a membrane that stops short of the floor waste flange. Each lets water track under the tiles where it can sit for years.



Annotated findings from Waterproofing inspections.




1Bored piersWith the piers drilled and the cages lowered in, before the concrete truck arrives
2Slab pre-pourOnce steel, pods and membrane are complete, the day before concrete
3FrameWith trusses fixed and before wall wrap or roof sarking closes it in
4Lock-up (pre-plaster)Roof, windows and brickwork in, plasterboard not yet delivered
5FixingLinings, doors and joinery in, painter not yet started
7Pre-handover (PCI)When the builder calls practical completion, before you sign or pay the final claim
How to line up slab, frame, lock-up, waterproofing, fixing and PCI inspections on a new Strathtulloh home without missing a window.

The vapour barrier under a slab is invisible for the life of the house. These are the membrane faults we find before Strathtulloh pours.

Trusses on the wrong wall, missing bracing rods and plates hanging off the slab. Why frame stage is about following the load to the ground.
Instant online pricing, or talk to the booking team on 1300 471 805.
AS 3740 for waterproofing domestic wet areas, the Housing Provisions and the Guide to Standards and Tolerances 2015.
Only indirectly, through leaks and moisture readings. The membrane itself has to be seen before tiles go down.
Every shower, bath, laundry and wet area the contract requires to be waterproofed.
A strip that lets the membrane flex at a junction instead of tearing as the building moves. If it is too thin, the membrane can split at the corner.
No. Our membrane check relies on sight and measurement only. Flood testing is a separate procedure the builder can arrange.
About an hour for a typical home with two bathrooms and a laundry.