For a Strathtulloh owner whose building dispute is heading to VCAT, this independent expert report follows the tribunal's expert evidence practice note and records each defect, the requirement it misses and the fix it needs.
One of our inspectors will call you back. If it is urgent, email [email protected].
Fully licensed & accredited
Building & Plumbing Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Each report follows VCAT Practice Note PNVCAT2, comparing the work with the contract and its plans and specifications, the National Construction Code, the Australian Standards that apply and the Guide to Standards and Tolerances relevant to the contract date.
19 checkpoints across 6 areas on a standard Strathtulloh vcat expert witness report. Where a ceiling space, subfloor or roof could not be reached safely, the report says so plainly and names what was left unseen.
Examples from recent inspections around Strathtulloh.










New Construction Stage Inspections Seven visits timed to the moment each part of the build is about to disappear behind concrete, plaster or tiles.
Pre-Handover (PCI) Inspections A room by room defect list before you sign off and make the last payment.
Building and Pest Inspections Building condition and a timber pest inspection under AS 4349.3 in a single visit.
Defect Investigation Reports Finding the cause of cracking, leaks or movement in a home you already own. Instant online pricing for Strathtulloh, or contact the booking team.
In most cases you do. Before a party can apply to VCAT about a domestic building work dispute, the Building and Plumbing Commission's dispute resolution service (formerly DBDRV) must issue a certificate of conciliation stating the dispute was not suitable for conciliation or was not resolved. Applications for an injunction do not need one. First, though, put the defects to your builder in writing.
Yes, and it helps. Because it sets out each defect, the requirement it fails and the remedy, the conciliation officer and the builder have specific items to address, and the service can appoint its own assessor to inspect as well. For a VCAT application, the building disputes practice note asks you to include any expert report you have on the defective or incomplete work.
No. Under PNVCAT2 an expert witness owes a paramount duty to VCAT rather than to the party who engaged them, and must not act as an advocate. So the report states where work is acceptable as plainly as where it is not.
It needs a summary of opinions, the expert's qualifications and experience, all instructions given, the facts and assumptions it relies on, the documents reviewed, any issue outside the expert's field and a signed declaration. Wherever rectification is recommended, the reasons, the likely cost and whether a reasonable alternative exists must be given. Photographs, measurements and the relevant clause back up every item.
Against the contract documents first, since section 8 of the Domestic Building Contracts Act 1995 implies warranties that the work matches the plans and specifications, complies with the law including the Building Act 1993, and is carried out with reasonable care and skill. Then against the National Construction Code and Australian Standards, among them AS 2870 for slabs on the basalt clay, AS 3740 for wet areas and AS 1684 for timber framing. The Guide to Standards and Tolerances sets the measure for tolerances and finishes.
Only if the contract was entered into, or the work started, on or after 1 August 2026. A home built under an earlier Strathtulloh contract is assessed against the 2015 Guide. Being advisory, the Guide yields to the contract, the law, the NCC or a standard where they differ.
Possibly not. A building action cannot be brought more than 10 years after the occupancy permit was issued, or the certificate of final inspection if there was no occupancy permit, under section 134 of the Building Act 1993. The section 8 warranties also pass to later owners, so the buyer of an established Strathtulloh home can rely on them within that period.
Where VCAT directs it, yes. Experts may be ordered to confer in a conclave, narrow the differences between them in good faith and file a joint report setting out the points agreed, the points not agreed and the reasons, which is sometimes called a Scott Schedule. The report is usually taken as read at a more complex hearing, and the tribunal may take evidence from the experts together as a panel.
On the date VCAT's orders give. If there is none, PNVCAT2 sets a minimum of 10 business days before the mediation, compulsory conference or hearing at which the report will be relied on. Late reports may be refused, so give us the tribunal dates as soon as you have them.
The report is prepared by an experienced building inspector, who visits the house, goes through your documents and signs the PNVCAT2 declaration. The report states the inspector's qualifications and any relationship with you, as VCAT requires.
Yes, in Melton South, Cobblebank, Thornhill Park, Weir Views and Melton as well as across the Strathtulloh estates. The fee depends on the number of disputed items, the size of the home and the documents to work through. A quote follows once we have read your contract and defect list.